Data Center Audit Case Studies
Practical infrastructure assessments that improve uptime, efficiency and operational reliability.
Case Study Image Placeholder
Tier III Colocation Facility, Western India
Thermal Mapping, Airflow Management, Containment Assessment.
Client ChallengeRising cooling costs and unexplained hot spots despite adequate total cooling capacity.
Audit FindingsSignificant bypass airflow through unsealed floor penetrations and missing blanking panels; two CRAC units operating in a fight-mode configuration.
Recommended SolutionContainment sealing program, blanking panel rollout, CRAC set-point recalibration.
Results AchievedMeasurable PUE improvement within one quarter of remediation, with payback inside the first year.
Read More →
Case Study Image Placeholder
BFSI Primary Data Center, South India
Electrical Infrastructure, Power Quality Analysis, Gap Analysis.
Client ChallengePreparing for regulatory audit while uncertain about single points of failure in electrical distribution.
Audit FindingsUnbalanced loading across UPS modules and a non-redundant distribution path feeding a critical rack row.
Recommended SolutionLoad rebalancing, distribution path redesign, breaker coordination correction.
Results AchievedSuccessful regulatory audit outcome with documented remediation evidence.
Read More →
Case Study Image Placeholder
Manufacturing Plant Facility, North India
Thermography, Fire Detection & Suppression, Preventive Health Check.
Client ChallengeRepeated unplanned shutdowns with no clear root cause identified internally.
Audit FindingsOverheating connections at two distribution panels flagged via thermal imaging, indicating imminent failure risk.
Recommended SolutionImmediate connection remediation, panel-level preventive maintenance schedule.
Results AchievedZero unplanned server room outages in the twelve months following remediation.
Read More →
Case Study Image Placeholder
Hyperscale Facility Readiness, Pan-India
TIA-942 Readiness, Commissioning Validation, Civil & Structural.
Client ChallengeNeed for independent readiness verification before committing to a certification timeline.
Audit FindingsStrong electrical and mechanical readiness; structural documentation gaps requiring closure before certification submission.
Recommended SolutionDocumentation remediation plan, phased commissioning validation schedule.
Results AchievedCertification-ready status achieved within the planned project timeline.
Read More →